Every job below is one we do ourselves across Socorro.
We build new decks from the footings up, sizing joists and beams to the actual span instead of eyeballing it. Footings get dug below grade and set in concrete so they don't shift in our clay and caliche soil.
Multi-level decks, built-in benches, stair placement, we work out the layout with you before any lumber gets cut. A deck that wraps around a pool or steps down to a yard needs the framing planned out ahead of time, not adjusted on the fly.
Split boards, loose joist hangers, and railings that have started to lean all get fixed without tearing out the whole structure. We check the ledger board and footings first, because a repair on top of a failing frame doesn't last.
We strip old finish, sand the boards, and let the wood dry out before any new stain goes on. Sealing after the stain coat is what keeps water from getting into the end grain and starting rot from the inside.
We install composite board like Trex or TimberTech to the manufacturer's hidden-fastener spec, with the gaps they call for so the boards don't buckle in the heat. Composite costs more up front but skips the yearly staining wood decking requires.
Baluster spacing gets set to code, under four inches, so a toddler or a dog can't squeeze through. We reset posts that have started to wobble and swap out rotted rail caps before they crack underfoot.
If the frame is still solid but the decking itself is cupped, gray, or splintering, we pull the old boards and put down new ones on the same structure. It costs less than a full rebuild and the deck looks new from the ground up.
Old decks get torn down and hauled off, including any buried footings you want gone before a new build or a patio goes in. We check what's salvageable first in case framing underneath is still good enough to reuse.
We frame a roof or pergola over an existing or new deck so it's usable in August, not just the two mild months here. Rafters and posts get sized for our wind loads, not just for looks.
Before you buy a house with a deck already on it, or if yours just feels soft underfoot, we'll check the ledger flashing, joist hangers, and footings and tell you straight whether it's a repair or a rebuild. A lot of deck failures start at the ledger board where it bolts to the house, and that's the first thing we look at.
Four steps, and no surprises in any of them.
You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.
In writing, itemised, free. If something might add cost later we flag it now rather than at the end.
Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.
You point out anything you are not happy with and we fix it before the invoice, not after.
Deck installation and repair quoted across Socorro and these nearby communities.
What to expect once a deck project actually gets underway.
Describe the problem and we will tell you what it probably is. No obligation.